Appendix B: Sample Checklists (e.g., Hold Inspection, Pre-loading, Pre-sailing, Mooring)

1. Cargo Hold Inspection Checklist (Pre-Loading)

ItemCheckRemarks
Hold clean and free of previous cargo residues☐ Yes ☐ No
No signs of infestation (insects, rodents)☐ Yes ☐ No
Bilge wells clean, dry, and covered☐ Yes ☐ No
Access ladders and manholes in good condition☐ Yes ☐ No
Lighting functional and secured (if applicable)☐ Yes ☐ No
Hold ventilators operational☐ Yes ☐ No
Tank top integrity confirmed, no cracks or corrosion☐ Yes ☐ No
Bulkheads and frames structurally sound☐ Yes ☐ No
Hold coating condition satisfactory☐ Yes ☐ No
Any strong odors detected?☐ Yes ☐ No
Photos taken and attached☐ Yes ☐ No
Chief Officer’s signature: ___________
Master’s endorsement: ___________

2. Pre-Loading Checklist

ItemCheckRemarks
Cargo documents received and reviewed☐ Yes ☐ No
Hold preparation confirmed completed☐ Yes ☐ No
Loading plan prepared and reviewed☐ Yes ☐ No
Stability calculations reviewed☐ Yes ☐ No
Vessel trimmed appropriately☐ Yes ☐ No
Hatch covers tested and confirmed weather-tight☐ Yes ☐ No
Communication with shore loading personnel established☐ Yes ☐ No
Draft marks readable and visible☐ Yes ☐ No
Cargo gear (if used) inspected☐ Yes ☐ No
Ballast plan prepared (if deballasting during loading)☐ Yes ☐ No
Loading restrictions (e.g., rates, sequences) known☐ Yes ☐ No
Emergency stop procedure agreed with terminal☐ Yes ☐ No
Pre-loading meeting with terminal completed☐ Yes ☐ No
Chief Officer’s signature: ___________
Master’s endorsement: ___________

3. Pre-Sailing Checklist

ItemCheckRemarks
Cargo loading completed and secured☐ Yes ☐ No
Final drafts, trim, GM calculated☐ Yes ☐ No
Stability within limits☐ Yes ☐ No
Ballast adjusted and secured☐ Yes ☐ No
Loadline marks confirmed not submerged☐ Yes ☐ No
Hatch covers secured and inspected☐ Yes ☐ No
Navigation equipment tested (radar, AIS, GPS, echo sounder, etc.)☐ Yes ☐ No
Main engine and steering gear tested☐ Yes ☐ No
Passage plan reviewed and approved☐ Yes ☐ No
Weather forecast obtained☐ Yes ☐ No
Crew briefed and stations assigned☐ Yes ☐ No
Logbooks updated☐ Yes ☐ No
Local authority clearances obtained☐ Yes ☐ No
Master’s signature: ___________

4. Mooring Operations Checklist (Arrival / Departure)

ItemCheckRemarks
Mooring lines prepared, inspected, and arranged☐ Yes ☐ No
Winches tested and brakes set☐ Yes ☐ No
Communication established with mooring team☐ Yes ☐ No
Emergency escape route clear☐ Yes ☐ No
Crew at stations wearing proper PPE☐ Yes ☐ No
Environmental conditions monitored (wind, tide, current)☐ Yes ☐ No
Use of tug(s) confirmed and briefed☐ Yes ☐ No
Mooring plan reviewed by deck team☐ Yes ☐ No
Vessel speed and approach angle under control☐ Yes ☐ No
Bollard locations and safe working areas known☐ Yes ☐ No
Line handling personnel briefed and supervised☐ Yes ☐ No
Post-mooring line tension adjusted as needed☐ Yes ☐ No
Chief Officer’s signature: ___________